|
07/20/2009 – Alpha Ventus offshore project: First AREVA turbine installed – one small step toward a great leap forward
After the successful installation of the six foundation structures between April 17 and June 1, the installation team sailed out with the first two tower sections on June 14. Installation was completed on July 3.
read the news
|